Skip to content
Real Estate

When your land becomes a road: muabja, the 15-day clocks and what happens to your lalpurja in Nepal

A four-member committee sets your compensation, the 1977 Act gives no appeal on the amount, and unclaimed muabja is forfeited after a final 3 months. The road-limit trap explained.

Mangsir 2083 BS15 min read

A relative of a friend owns a three-storey house on a main road west of Kalanki. In 2071 someone from the road office painted a line across his front wall, three metres inside the gate. No letter came with it. He kept paying land tax on the full plot, as he had for thirty years, and assumed that settled who owned what.

It does not. The Supreme Court has said in terms that paying tax on a plot nobody struck from the register does not preserve your ownership of it. Whether he is owed anything for those three metres depends on which law the road office was using, and on a gazette notice printed before he was born.

Two routes, two very different outcomes

Route one is acquisition. The government decides it needs your plot for a road, airport or tunnel, publishes notices, sets a price and pays. The Land Acquisition Act 2034 (the Nepali text, amended through 2082) governs this, and the Constitution backs it: Article 25 bars the state from acquiring property except in the public interest, and leaves "the basis of compensation and the relevant procedure" to be set by Act.

Route two is the road limit. Section 3 of the Public Roads Act 2031 lets the government fix a road's boundary by gazette notice, up to 31 metres on each side of the centre line. A notice dated 20 Asar 2034 is the one most disputes turn on. Supreme Court records show it setting highways at 25 metres a side and feeder roads at 15 metres a side. On top of the limit, Section 3A lets the government ban permanent structures (other than a compound wall) within a further 6 metres.

Section 4 of the same Act says land needed for a road or its limit is to be acquired under the land acquisition law. In practice, for decades, limits were declared and nothing was acquired. Owners kept their lalpurja, kept paying tax, and built. The fight over who pays for that gap is the second half of this post.

How the price is set

Under Section 13 the compensation is fixed by a committee of four:

  • the Chief District Officer,
  • the Land Administrator or chief of the Land Revenue Office,
  • the project chief, or an officer the CDO names,
  • a representative of the municipality or rural municipality.

No landowner sits on it. Compensation is paid in cash. Land-for-land is possible under Section 14 only for someone whose land is taken entirely, and only if government land is available.

What the committee must weigh is thinner than most owners expect. For a government project, Section 16 names two things: guidelines the government issues from time to time, and the loss from having to move a home or business. The phrase "price of the land at the time of the notice" appears only for acquisitions on behalf of non-government institutions. Neither the market rate nor the Malpot minimum valuation is the legal benchmark, so the rate is whatever the committee can defend.

The results vary enormously between projects:

ProjectCompensation fixedContext
Kathmandu–Terai Fast Track, KhokanaRs 25 to 44 lakh per ropaniA local quoted market price near Rs 30 lakh per aana
Nagdhunga tunnel, Dhading sideRs 7.5 to 9.5 lakh per aanaSloping land; about Rs 6.75 billion paid for 109 ropani
Nijgadh airportRs 2.4 to 4.6 lakh per katthaBy road access; set in 2017
Budhigandaki hydropowerRs 5 to 8 lakh per ropaniMarket rate reported near Rs 35,000

Sources: Annapurna Express, Apr 2022 (Fast Track); Kathmandu Post, Nov 2019 (Nagdhunga, Budhigandaki); Kathmandu Post, Mar 2017 (Nijgadh).

A ropani is 16 aana, so Khokana's top rate of Rs 44 lakh per ropani works out to Rs 2.75 lakh per aana (my calculation), against a market the owner put at roughly eleven times that. Budhigandaki went the other way and paid many times the market. Which side of that you land on is decided before the committee signs, the only stage at which the Act leaves room to negotiate. The land units post has the conversions if your notice quotes a unit you do not use.

Buildings, walls and trees count as part of the "land" under Section 2, and Section 13 allows different rates for people losing all their land versus part of it. An owner can ask under Section 29 that all crops, trees and structures on the acquired portion be taken too. No section lets you force the government to buy the useless sliver left behind.

The clocks

The Act runs on short deadlines, and the notices are posted on walls and at offices, not mailed to you.

StepDeadlineWhere
Preliminary notice (s.6)Officials may enter 3 days after postingPosted near the land and on the house
Complaint about crop or wall damage in the survey (s.7)15 daysCDO, whose decision is final
Formal notice (s.9)Land Revenue Office freezes transfers of the plotPosted at project, district, municipal and Malpot offices
Objection to the acquisition itself (s.11)7 days from the s.9 notice, plus travel timeMinistry of Home Affairs, through the local officer
Claim for compensation with proof of title (s.10)At least 15 days, as stated in the noticeLocal officer
Complaint against the list of payees (s.18)15 daysMinistry of Home Affairs
Uncollected compensation (s.37)Final notice of 3 months, then forfeitedMoney goes to the Consolidated Fund
Disputed ownership (s.18)2 years from the final court decisionMoney is held until then

Three points in that table deserve to be said plainly.

There is no appeal on the amount. The 7-day and 15-day complaints are about whether the land should be taken and who gets paid. A 15-day complaint about the figure exists only for emergency acquisitions under Section 25, and the Home Ministry's decision there is final. For everyone else, the routes are negotiation before the rate is fixed (Section 27 lets the government buy by agreement) and a writ petition after.

Unclaimed money is gone. Owners who refuse the cheque in protest should know Section 37: after the final three-month notice, the person "shall not be entitled to any compensation".

Your house has a floor of protection. Under Section 12, a house the owner lives in cannot be taken into possession until 50 percent of the compensation is paid, or a reasonable moving advance where the amount is not yet fixed.

Who gets the cheque

The compensation follows title, which is why the 15-day claim asks for proof of it.

  • Tenanted land. A registered mohi gets 50 percent of the compensation under Section 20, and all of it for a house built with the owner's consent. If your lalpurja carries a mohi you never bought out, half the cheque is theirs.
  • Guthi land. The Land Act gives the tenant half, but the Guthi Sansthan's regulation gave one-third, and tenants were paid one-third for 24 years. A parliamentary committee directed 50 percent after tenants on the Nagdhunga tunnel route complained. The guthi and raikar post explains why the word on your lalpurja decides this.
  • Unregistered land. The Act has no rule entitling someone without title. At the Sirsiya dry port, about 3 bigha of unregistered land out of 62 remained unpaid pending registration, and owners began a sit-in in October 2026.
  • Unpaid dues. Section 21 lets land revenue and other government dues be deducted from the award.
  • Mortgaged land. I found nothing in the Act, in NRB material or in news on whether the bank or the borrower receives the money. If the plot is collateral, write to your bank the day the first notice goes up.

The road-limit trap

Now the three metres on that front wall.

2017: the Court sides with owners. In Sanu Shrestha v. Government of Nepal (Decision No. 9986, 18 September 2017), a full bench dealt with the Kalanki to Nagdhunga road, where the government had decided in 2071 to widen from 8 to 11 metres a side without paying. The Court held that fixing a road limit does not end the landowner's title. It quashed the decision and ordered compensation for the extra 3 metres a side under the 1977 Act. Houses built before permits were required were to be valued from their year of construction and house-tax receipts. The government asked for a review; a five-judge bench refused in March 2019, by which time the estimated cost of that 12.5 km stretch had risen from about Rs 1.64 billion to almost Rs 16.39 billion.

Then the government stopped widening. A project spokesperson told the Kathmandu Post in January 2020 that no decision to pay had been made and roads would be widened only in whatever space was available. By October 2020 the Department of Roads planned to close the Valley project with 72 of 112 km done. A court win stopped the bulldozer. It did not produce a cheque that I could find reported.

2023: the Court sides with the state, for older limits. In Decision No. 11226 (January 2023) on the Galchhi to Rasuwagadhi road, a full bench held that land inside limits declared under the 2021 BS Highway Act, 25 yards a side, is treated as already acquired. The 2034 re-notification did not revive a claim. Paying land tax because the plot was never removed from the register did not preserve ownership. Only houses built before the widening notice get compensation, on humanitarian grounds.

Other rulings fill in the edges:

RulingHolding
No. 9363 (2071)An approved building plan creates no right for a structure inside the road limit
No. 10953 (2079)Houses built without breaching the 25 m limit are compensated; those built in breach are not
No. 11056 (2079)Taking property without compensation is unconstitutional even where the 6 m rule applies

The working rule that comes out of this: land the state takes beyond an existing declared limit is compensable, and land inside a limit declared decades ago mostly is not, with the house treated more kindly than the ground under it. The date and width of the gazette notice for your specific road is the fact everything turns on.

The dispute is live. In Hetauda, about 500 structures were demolished in December 2025 for a 9.5 km widening. The case was referred to a full bench in February 2026 and was still unheard in June, with no compensation reported paid.

What happens to your lalpurja

Ownership passes to the government when it takes possession (Section 22). Within 15 days the local officer writes to the land records office to strike the plot from the revenue register, and that office must notify the former owner (Section 23). If only part of the plot was taken, your lalpurja should come back showing the reduced area.

Check that it does. A lalpurja still showing the old area will mislead the next buyer and their bank, and you will keep being billed land tax on ground you no longer own. The steps at the Survey Office for splitting the plot are not set out in the Act, so ask the Malpot what it needs from you.

One provision works in your favour later: under Section 34, land acquired and then not used must be returned if the owner refunds the compensation.

Tax on the money

The Income Tax Act 2058 does not mention acquisition and contains no exemption for compensation. Capital gains tax on land is ordinarily collected by the Land Revenue Office when a sale deed is registered, and an acquisition has no sale deed. I found no IRD circular or ruling on what happens in practice, so I cannot say whether tax is withheld from an award.

Two things in the Act are relevant. Disposals under Rs 10 lakh, and a private home owned and lived in for 10 years, fall outside the taxable asset definition. And Section 46 lets a person whose asset is disposed of involuntarily, and who acquires a similar replacement within one year, elect rollover treatment in writing. If you plan to buy replacement land with the award, that one-year window matters. The property capital gains post covers how the gain is computed on an ordinary sale; take the award letter to a tax advisor before you file.

How long the money takes

Slowly, and sometimes the money exists and still does not reach owners. The Auditor General's 63rd report found that of Rs 8.52 billion advanced to seven district offices for railway land, Rs 3.87 billion was still sitting in their accounts. Landowners on the Bardibas railway line have waited about seven years. On the Fast Track, as of September 2026, 136 ropani of private land at Khokana was valued but not acquired and another 165 ropani not yet valued.

Once the Section 9 notice is posted, the Malpot stops transfers of the plot. From that day you cannot sell, and a bank will not take it as collateral, however long the payment takes. Plan your cashflow on the assumption that the land is frozen and the cheque is years out.

Before you buy near a road

The formal acquisition shows up in the checks you already do. The transfer freeze after a Section 9 notice appears as a rokka at the Malpot, which the land-buying checklist covers.

A road limit does not show up. The whole point of the 2023 ruling is that these strips were never struck from the register, so the lalpurja, the trace map and the tax receipts all look clean. A passed naksha is no protection either, per Decision No. 9363. No official checklist exists for this, so the checks are manual:

  1. Find out the road's class (highway, feeder, district or urban) from the Division Road Office.
  2. Ask that office for the declared limit from the centre line, and the gazette date.
  3. Measure from the centre line yourself. Then add the 6-metre setback for permanent structures.
  4. Ask the municipality in writing whether the plot is affected by any road limit or planned widening before you pay bayana.

If you are borrowing, put the same questions to the bank's valuer; the valuation post explains how they reach their number. A cash buyer has nobody else checking.

Law that may change this

Two drafts are in circulation, and neither is law. The Home Ministry has a draft bill replacing the 1977 Act that would require "reasonable and just" compensation, let provinces and local governments acquire land, and return land left unused for two years. A separate roads bill would set highways at 25 metres a side, keep the 6-metre setback, and fine building inside the limit up to Rs 5 lakh. As of late September 2026 neither had a reported step in Parliament. Until one passes, the 1977 Act and its deadlines apply.

What you actually need to know

  • Read the notice for which law it cites. Land Acquisition Act means a committee, a rate and a cheque. Public Roads Act and a "road limit" means the state may say the strip was never yours to be paid for.
  • 7 days to object, 15 days to claim, 3 months before unclaimed money is forfeited. No appeal exists on the amount, so the bargaining happens before the committee signs.
  • A clean lalpurja does not clear a roadside plot. Get the declared limit and gazette date from the Division Road Office and measure from the centre line before paying bayana.

Got a notice on your wall and not sure which route it is? Email [email protected] with a photo of it and I will tell you which sections apply.

This post is part of the Nepal Money Basics guide — the big-ticket decisions section.

Frequently asked questions

Who decides the compensation (muabja) when the government acquires land in Nepal?
A four-member Compensation Fixation Committee under Section 13 of the Land Acquisition Act 2034: the Chief District Officer, the chief of the Land Revenue Office, the project chief, and a representative of the municipality or rural municipality. Compensation is paid in cash. For government projects, Section 16 tells the committee to consider government guidelines and the loss from shifting a home or business; it does not tie the figure to market price or to the Malpot minimum valuation.
Can I appeal if the compensation for my land is too low?
In an ordinary acquisition the 1977 Act has no appeal against the amount. You can complain to the Ministry of Home Affairs against the acquisition itself within 7 days of the formal notice, and against the list of people entitled to compensation within 15 days. A 15-day complaint about the amount exists only for emergency acquisitions under Section 25. That leaves negotiation before the rate is fixed, and a writ petition, as the practical routes.
Does the government pay compensation for land inside the road limit (sadak seema)?
It depends on when the limit was declared. In September 2017 the Supreme Court held that fixing a road limit does not end the owner's title and ordered compensation for extra land taken on the Kalanki to Nagdhunga road. In January 2023 a full bench held that land inside highway limits declared under the 2021 BS Highway Act counts as already acquired, with compensation only for houses built before the widening notice. Government has largely avoided paying by widening only into available space.
What happens if I do not collect my land compensation?
You lose it. Under Section 37 of the Land Acquisition Act 2034, if compensation is not collected within the set time, the local officer issues a final time limit of three months. After that the person is not entitled to any compensation and the money goes to the government's Consolidated Fund. Where ownership is in dispute, the money is held and must be claimed within two years of the final court decision.
How much of the compensation does a tenant (mohi) get?
Half. Section 20 of the Land Acquisition Act gives a registered tenant 50 percent of the compensation payable for the land, and the full compensation for a house the tenant built with the owner's consent. On guthi land the position is contested: the Land Act gives the tenant 50 percent, but the Guthi Sansthan's regulation gave one-third, and a parliamentary committee directed 50 percent after tenants on the Nagdhunga tunnel route complained.
Is land compensation taxed in Nepal?
The Income Tax Act 2058 has no explicit exemption for acquisition compensation and never mentions acquisition by name. Capital gains tax on land is normally collected by the Land Revenue Office at registration, and an acquisition involves no sale deed, so I found no IRD guidance on how it is handled in practice. Section 46 lets someone who loses an asset involuntarily and buys a similar one within a year elect rollover treatment in writing. Take the award letter to a tax advisor before filing.

More in Real Estate